
Work on the second phase of Khair Khana Kotal Road is progressing rapidly and in accordance with technical standards, with efforts aimed at completing the project as soon as possible. This phase runs from the upper part of the Kotal to Bostan Road, measuring 2,520 meters in length and 60 meters in width, and is designed with two lanes. One lane has recently been asphalted and opened to traffic, while construction continues on the remaining sections to prepare them for paving. As a key transit route, Khair Khana Kotal Road is being constructed with sidewalks, drainage systems, flowerbeds, and other standard roadway features
