Asphalting work has commenced on one of the side lanes of the connecting road from Airport Intersection to the Gumrak Area. This 2,794-meter-long and 60-meter-wide road features two main lanes and two side lanes, with most sections already asphalted. The two main lanes are being paved with three layers of asphalt, while the two side lanes are being paved with two layers. The project also includes the construction of a canal, culverts, roadside drains, pedestrian walkways, flowerbeds, bicycle lanes, as well as the installation of streetlights and road markings. Engineers from Kabul Municipality’s Directorate of Programs and Projects Management are conducting continuous technical and engineering inspections to ensure the quality of work