Kabul Weather


Flights List

Prayer Times – Kabul

Loading...

Exchange Rates – Today

Loading...

Kabul Newspapers

Contact Us

  • Kabul Municipality, District 10, Near the Ministry of Foreign Affairs
  • 020-210-0000

Construction of Kamari Road in Western Part of Bagrami Continues

 16211.jpg (1820 × 1024)

In District 22, construction work is ongoing on Kamari Road, located to the west of Bagrami. The project includes constructing a major drainage canal along the route, with several sections expected to be ready for asphalt paving soon. The road stretches 2,586 meters in length, with widths varying at 31, 26, and 6.5 meters, connecting the Bagrami area to Kamari village. The project also involves constructing a 1,255-meter-long canal measuring 2 meters in width, 46 culverts each 4.4 meters long and 3 meters wide, and a retaining wall 85 meters long, 2.7 meters high, and 1.9 to 2.1 meters wide. Additional features include side drains, pedestrian walkways, flowerbeds, road markings, streetlights, and other standard road elements. This initiative is part of Kabul Municipality’s development plan and plays a key role in expanding transportation infrastructure and easing traffic congestion