Kabul Weather


Flights List

Prayer Times – Kabul

Loading...

Exchange Rates – Today

Loading...

Kabul Newspapers

Contact Us

  • Kabul Municipality, District 10, Near the Ministry of Foreign Affairs
  • 020-210-0000

Construction of the Road from Airport Intersection to Gumrak Area Reaches 80% Completion

 16216.jpg (1820 × 1024)

As part of efforts to expand Kabul’s transport infrastructure and stimulate economic growth, foundational work on the remaining sections of the new connecting road from Airport Intersection to the Gumrak area is in progress, with preparations underway for asphalt paving. The road, stretching 2,794 meters in length and 60 meters in width, began construction last year and has now reached 80 percent completion. Authorities aim to finalize the project and open it for public use within the current year. The project includes a canal, culverts, side drains, pedestrian walkways, flowerbeds, bicycle lanes, road markings, traffic signs, and other standard road features. To ensure quality, engineers from the Directorate of Programs and Projects Management of Kabul Municipality are carrying out continuous technical and engineering inspections