Kabul Weather


Flights List

Prayer Times – Kabul

Loading...

Exchange Rates – Today

Loading...

Kabul Newspapers

Contact Us

  • Kabul Municipality, District 10, Near the Ministry of Foreign Affairs
  • 020-210-0000

Asphalt Work on Road from Stanikzai Intersection to Bagrami Continues

 17290.jpg (1820 × 1024)

Asphalt paving on the road from the Stanikzai intersection to Bagrami in District 8 is moving forward in full compliance with technical and engineering standards. The road extends 2,530 meters in length and 40 meters in width. Asphalt work on the first lane has been completed along a one-kilometer section, while work on the second lane is currently ongoing. The project features the construction of drainage systems, sidewalks, flowerbeds, green spaces, bicycle lanes, culverts, streetlights, and other standard road components. Once completed, the project will help reduce traffic congestion along the Kabul–Logar highway and support economic growth in the surrounding areas. Additionally, construction on the road from the Stanikzai intersection to the Beni Hisar area is being carried out simultaneously