
Construction work on the 4th section of Gull Bagh Road, extending from Chehel Dokhtaran to the Kabul–Logar Road within District 20, is currently underway.
This section of the road measures 2,422 meters in length and 33 meters in width. It is being constructed to include drainage channels, pedestrian walkways, culverts, street lighting, and other components of a standard road.
It is worth noting that Gull Bagh Road stretches more than 12 kilometers from Darulaman Palace to the Kabul–Logar Road. The road has been designed in four sections and serves as a key route connecting the western part of Kabul to the southern areas of the city.
Construction on the 4th Section of Gull Bagh Road Continues
