Kabul Weather


Flights List

Prayer Times – Kabul

Loading...

Today's exchange rates

1 USD 63.90 AFN
1 EURO 74.40 AFN
1 UAE DIRHAM 17.47 AFN
1 IRAN Toman 0.35 AFN
1 PAKISTAN Rs 0.223 AFN
1 INDIAN Rs 0.74 AFN

Kabul Newspapers

Contact Us

  • Kabul Municipality, District 10, Near the Ministry of Foreign Affairs
  • 020-210-0000

Construction of the Main Layers of the Second Section of Gull Bagh Road Continues


Construction work on the main layers of the second section of Gull Bagh Road, extending from Faisal Township to Gull Bagh Bridge, is currently underway, and some sections will soon be prepared for asphalting.
The second section of the road measures 2,396 meters in length and 33 meters in width. It has been designed to include a culvert measuring 24 meters in length and 1.2 meters in width, as well as pedestrian walkways, flowerbeds, streetlights, road markings, and other components of a standard road.
Gull Bagh Road is regarded as one of Kabul city’s key economic corridors, linking the western part of the city with its southern areas. The project is expected to play an important role in the development of transportation and traffic infrastructure.