
Construction work on the main layers of the second section of Gull Bagh Road, extending from Faisal Township to Gull Bagh Bridge, is currently underway, and some sections will soon be prepared for asphalting.
The second section of the road measures 2,396 meters in length and 33 meters in width. It has been designed to include a culvert measuring 24 meters in length and 1.2 meters in width, as well as pedestrian walkways, flowerbeds, streetlights, road markings, and other components of a standard road.
Gull Bagh Road is regarded as one of Kabul city’s key economic corridors, linking the western part of the city with its southern areas. The project is expected to play an important role in the development of transportation and traffic infrastructure.
Construction of the Main Layers of the Second Section of Gull Bagh Road Continues
