Kabul Weather


Flights List

Prayer Times – Kabul

Loading...

Today's exchange rates

1 USD 63.90 AFN
1 EURO 74.40 AFN
1 UAE DIRHAM 17.47 AFN
1 IRAN Toman 0.35 AFN
1 PAKISTAN Rs 0.223 AFN
1 INDIAN Rs 0.74 AFN

Kabul Newspapers

Contact Us

  • Kabul Municipality, District 10, Near the Ministry of Foreign Affairs
  • 0202101358

Foundational Construction on Road from Joy Shir to Pul-e Artel Continues


Construction work on the foundational sections of the road extending from Joy Shir to Pul-e Artel is underway, with efforts ongoing to prepare the road for asphalt paving soon.
The road, measuring 860 meters in length and 45 meters in width, has been designed to include a 273-meter canal, a 95-meter retaining wall, sidewalks, green spaces, lighting systems, and road markings and is expected to be completed and opened for public use within the next three months.
It is also noted that the expansion of roads in congested areas plays an important role in promoting urban economic growth and providing greater convenience for residents and commuters.