Kabul Weather


Flights List

Prayer Times – Kabul

Loading...

Today's exchange rates

1 USD 64.55 AFN
1 EURO 74.51 AFN
1 UAE DIRHAM 17.47 AFN
1 IRAN Toman 0.0009 AFN
1 PAKISTAN Rs 0.2328 AFN
1 INDIAN Rs 0.75 AFN

Kabul Newspapers

Contact Us

  • Kabul Municipality, District 10, Near the Ministry of Foreign Affairs
  • 0202101358

Second Asphalt Layer Begins on Joy-e-Shir to Pul-e Artel Road


Kabul Municipality has started asphalt paving of the second layer of the Joy-e-Shir–Pul-e Artel Road in accordance with technical and engineering standards. Efforts are underway to complete the remaining works of the project as soon as possible, God willing, and open the road to the public.
The road construction and development project is 860 meters long and 45 meters wide. It includes the construction of canals and drainage channels, retaining walls, sidewalks, flowerbeds, a lighting system, and road markings.
Once completed, the project will improve transportation and access to different parts of the city, while facilitating more organized vehicular movement and enhancing traffic flow along the route.